EasyManua.ls Logo

Strom SBSP7C - Wall Mounting the Boiler; Location and Clearance Guidelines; Drilling and Fixing Instructions

Strom SBSP7C
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
23
WALL MOUNTING THE BOILER
Electric Boilers
IMPORTANT
When choosing a location to mount the boiler it is important that you consider clearance, servicing the boiler,
and safe and suitable operation.
The boiler should be tted out of the reach of children, people of deminished responsability, and people who
may otherwise access the boiler internals without the proper skills and qualications as opening the boiler
should only be done by a qualied electrican after rst isolating the electrical supply. If there is the possability
that the boiler could be opened without rst isolating the electrical supply then you must install it in a fashion
that prevents access to the boiler, such as a lockable cupboard.
In terms of clearance strom recommend at least 100mm from all xed obstructions on all sides of the boiler.
Please ensure that the designated wall for mounting the boiler has the structural integrity to support the unit
when full. The following guidance is provided for sound solid brick wall mounting, your mounting may vary.
1. Using a drill create 6 holes as per the including wall mounting diagram. The upper holes should be Φ8
diameter, and the lower holes Φ6.
2. Secure the 3 supplied Φ8 expansion bolts into the top three holes.

Related product manuals