28
Electric Boilers
CHECK WATER CONNECTIONS
It is important not only to check for leaks on the pipework installed by yourself, but also to check the internals of
the boiler for any leaks over a few hours after installing the boiler.
Every boiler is pressure tested inside our factory however after a long journey and installation it can sometimes by
necessary to tighten connections when water escapes occur. Please do not unnecessarily tighten connections,
or over tighten them, only as required in the few hours after intial installation.
If you are unable to check for leaks in the few hours after installation please drain down and only ll the system
again when you have the time to do so. This applies to one circuit on a system boiler and both circuits on a
combination boiler.