EasyManua.ls Logo

Strom SBSP7C - Plumbers Installation Checklist; Plumber Completion Details

Strom SBSP7C
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
37
Electric Boilers
PLUMBERS CHECKLIST
PLUMBER TO COMPLETE...
COMPANY NAME:
PLUMBERS NAME:
COMPANY ADDRESS:
COMPANY TELEPHONE:
DATE OF INSTALLATION: PRODUCT CODE:
WAS THIS A EXISTING INSTALL OR NEW INSTALL? EXISTING NEW INSTALL
HOW MANY HEATING ZONES ARE INSTALLED? 1 2 3+
HAS THE FILLING LOOP BEEN REMOVED & CAPPED OFF? YES NO
WAS AN ABV FITTED? AT WHAT SETTING? YES NO SETTING:
WHAT IS THE HEATING PRESSURE SET AT? . Bar
WHAT IS THE INCOMMING MAINS PRESSURE? . Bar
WHAT HAS THE BOILER FLOW TEMPERATURE BEEN SET AT?
o
C
WHAT HAS THE BOILER DIFFERENTIAL TEMP. BEEN SET AT?
o
C
WHAT PUMP SPEED HAS BEEN SET ON THE BOILER?
NOTES:
BY SIGNING YOU AGREE THAT YOU HAVE INSTALLED THE BOILER IN ACCORDANCE WITH THIS MANUAL
AND THAT THE BOILER IS WORKING AS INTENDED WITHOUT ANY LEAKS AND ALL INSTALLER MADE AND
FACTORY MADE CONNECTIONS HAVE BEEN CHECKED.
SIGNED: DATE:

Related product manuals