EasyManua.ls Logo

Stryker Isolibrium 2971 - Page 57

Stryker Isolibrium 2971
202 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EENN
www.stryker.com 2971-109-0 01 REV B 1-49
Service
Power cord replacement (Continued)
6. Disconnect the power cord quick connect (F) from the power supply (Figure 1-22 on page 1-48).
7. Feed the two pin connector through the nut (E) (Figure 1-22 on page 1-48).
8. Remove and discard the power cord (AV) (Figure 1-22 on page 1-48).
9. Reverse steps to reinstall.
Notes
During reinstall, first assemble the power cord ground star washers and nut, and then the power supply ground
star washers and nut.
During reinstall, make sure to align the Velcr patches.
After installation, remove the zipper pull tool or equivalent from the zipper.
Make sure that the watershed covers the zipper.
10. Verify proper operation before returning the product to service.

Other manuals for Stryker Isolibrium 2971

Related product manuals