EENN
www.stryker.com 2971-109-0 01 REV B 1-61
Service
Turn bladder assembly replacement
Tools required:
• Zipper pull tool or equivalent
• Diagonal pliers
Procedure:
1. Remove the top cover. See Cover replacement, top on page 1-34 for removal.
2. Separate the six Velcro® connectors holding the foot section gel crib to the pod assembly.
3. Remove the foot section gel crib (F) (Figure 1-32 on page 1-61). Save the gel crib.
Figure 1-32: Gel crib
4. Lift up on the bottom corner of the pods assembly and foam crib and disconnect the turn bladder quick disconnect.
Repeat for the opposite side.
5. Remove the turn bladder red and black sensor hoses from the foot box. Push in on the sensor hose quick connector
and then pull outward on the hose.
Note: Do not kink or bend the hoses.
6. Remove the hoses from the purse clips.
7. Lift up on the foam crib, reach between the foam crib and the bottom cover to unhook the six Velcro® retainers (A)
and unsnap the 12 snap retainers (B) (Figure 1-33 on page 1-62). Repeat for the opposite side.