EasyManua.ls Logo

Stuart Turner MAINSBOOST VariQ - Pump Starting Procedure; Control Panel Operation

Stuart Turner MAINSBOOST VariQ
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 15
-
5.4. Starting:
a) Ensure all outlets are closed, turn power supply ‘on’ - pump will start, pressurise
the system then stop.
b) Open and close all outlets in turn associated with the pump, (including w/c
systems) allowing water to flow from each outlet until all air is purged. As each
outlet is opened and closed, the pump will start and stop respectively.
c) Note: After closing the outlet there will be a small time delay before the pump
stops, which is normal.
d) Any tap or control valve within the system when opened and closed will now
turn the pump on/off. Providing this is the case the system is now operating
correctly.
e) Carefully check pump and pipework for leaks whilst pump running and stationary
before leaving the installation unattended.
5.5. For further technical support: Phone the Stuart Turner TechAssist team on +44
(0) 800 31 969 80. Our staff are trained to help and advise you over the phone.
How to use the control panel:
a) Ensure the pump has mains power. The pump will power up 3 seconds after
mains power is introduced.
b) Press and hold start/stop key for 3 seconds to enter speed mode.
c) Select desired pressure using up or down arrows to change the ‘SET PRESSURE’
display to desired pressure.
d) Press and hold start/stop key again to stop pump operation.
e) Press and hold ‘Reset’ button for 3 seconds to reset pump to default pressure of
3.5 bar.

Related product manuals