Series GEN 2 Ultrasonic Humidifier IOM Manual
Operation
Purge the Water Line
Before operating the unit, metal shavings or debris that may form during the installation process must be
flushed from the water supply piping. Take these steps before allowing water to ow into the Ultrasonic
Humidifier:
1. Verify the main disconnect switch from the control box is set to Off.
2. With the water supply valve closed, disconnect the supply tubing from the lter strainer in the
back of the unit.
3. Open the supply valve and ush the tubing into a bucket or building drain for about 30 seconds.
4. After the water line is purged, close the valve and reconnect the supply line to the inlet strainer and
ow regulator.
Initial Operation Checklist
For new installations, prior to start up, ensure the unit is ready to operate by verifying the following
checklist.
The humidifier is installed horizontally and level.
No obstacle is in front of the atomizing direction.
The electrical wiring is correctly connected.
Power to the humidifier is 48VDC.
DI or RO supply water is used.
The water supply piping and drain piping are correctly connected and secured.
All parts are correctly installed.
After the above items are verified, the humidifier is ready to operate.
Operation Procedure
1. Turn on power.
2. Verify the fan is operating.
3. Turn the main power source switch on the control box to the On position.
4. Open the water supply valve.
This allows water to flow to the humidifier.
5. Perform a manual drain cycle to flush any particulates from the tank using the system
controller (see STULZ Ultra-Series Controller IOM Manual OUU0078).
6. Set the humidity setpoint to the desired humidity level.
Water is supplied to the water tank and when the required water level is reached, the ultrasonic
nebulizers will start producing atomized mist.
7. If the humidifier does not start, increase the setpoint of the humidistat.
Mist is carried through mist guide by the ow of air from the AHU’s fan. The mist is delivered
through the ductwork thus humidifying the surrounding air.
The humidifier starts and stops by means of a signal from the control box.
8. During operation, the water level in the tank is maintained by the level controller.
9. If the water level in the tank falls below the safety level for any reason during operation,
power to the ultrasonic humidifier nebulizers is cut off by the level controller.