TABLE OF CONTENTS
Section 4 PAGE
INSTALLATION
(CONTINUED) 25 4.2 VENTILATION AND COOLING
25 4.3 SERVICE AIR PIPING
25 4.4 COUPLING ALIGNMENT CHECK
26 4.5 FLUID LEVEL CHECK
26 4.6 ELECTRICAL PREPARATION
27 4.7 MOTOR ROTATION DIRECTION CHECK
Section 5
SUPERVISOR CONTROLLER™
28 Figure 5-1 Supervisor Controller™ Panel
Section 6
OPERATION
29 6.1 GENERAL
29 6.2 PURPOSE OF CONTROLS
30 6.3 INITIAL START-UP PROCEDURE
30 6.4 SUBSEQUENT START-UP PROCEDURE
30 6.5 SHUTDOWN PROCEDURE
Section 7
MAINTENANCE
31 7.1 MAINTENANCE INTRODUCTION
31 7.2 DAILY OPERATION
31 7.3 MAINTENANCE AFTER INITIAL 50 HOURS OF
OPERATION
31 7.4 MAINTENANCE AS REQUIRED BY LUBRICATION
GUIDE (SECTION 3)
31 7.5 FLUID CHANGE
31 7.5.1 FLUID CONTAMINATION BASED UPON FLUID
ANALYSIS
31 7.6 MOTOR BEARING
31 7.7 SEPARATOR MAINTENANCE
31 7.8 PARTS REPLACEMENT AND ADJUSTMENT PROCEDURES
31 FLUID FILTER MAINTENANCE
33 AIR FILTER MAINTENANCE
33 AIR/OIL SEPARATOR ELEMENTS REPLACEMENT
34 OIL RETURN/SIGHT GLASS MAINTENANCE
35 DIFFERENTIAL PRESSURE REGULATOR ADJUSTMENT
35 DRIVE COUPLING INSTALLATION AND ALIGNMENT
Continued ...