EasyManua.ls Logo

Sullair TS32-300 - Page 4

Sullair TS32-300
80 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TABLE OF CONTENTS
61 4.3 SERVICE AIR PIPING
61 4.4 COUPLING ALIGNMENT CHECK
61 4.5 FLUID LEVEL CHECK
61 4.6 MOTOR ROTATION DIRECTION CHECK
62 4.7 FLUID PIPING (REMOTE AIR-COOLED OPTION ONLY)
62 4.8 ELECTRICAL PREPARATION
SECTION 5—OPERATION
63 5.1 INTRODUCTION
63 5.2 PURPOSE OF CONTROLS— INTRODUCTION
65 5.3 INITIAL START-UP PROCEDURE
65 5.4 SUBSEQUENT START-UP PROCEDURE
65 5.5 SHUTDOWN PROCEDURE
SECTION 6—MAINTENANCE
67 6.1 GENERAL
67 6.2 DAILY OPERATION
67 6.3 MAINTENANCE AFTER INITIAL 50 HOURS OF OPERATION
67 6.4 MAINTENANCE EVERY 1000 HOURS
67 6.5 FLUID CHANGE
68 6.6 PARTS REPLACEMENT AND ADJUSTMENT PROCEDURES
73 6.7 DRIVE COUPLING INSTALLATION AND ALIGNMENT
75 6.8 TROUBLESHOOTING— INTRODUCTION

Table of Contents

Related product manuals