EasyManua.ls Logo

Sunbeam CAFE DUO - Page 9

Sunbeam CAFE DUO
38 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Insert group handle
- Insert the 2 CUP filter basket in the
group handle.
- Align the group handle with the 'INSERT'
position located on the left of the group
head.
- Insert the group handle flat against the
group head, then turn the group handle
right all the way to the centre position.
Step 6. Prime espresso machine
- Press the 2 CUP button and water
should start flowing from the group
head.
- Allow water to run through until it stops.
- The machine will return to the READY
state.
- Position steam wand over the drip tray.
- Rotate steam lever to ON position.
- Allow steam to run through for 20 sec.
- Return steam lever to OFF position.
- Now the espresso machine should be
thoroughly primed.
- Wash group handle, milk jug and filter
baskets in warm water and dry before
making your first coffee.
- If water is not flowing from the group
head or steam wand, repeat Step 6.
- If water is still not running through,
contact Sunbeam Customer Care.
Details are on the back page.
9
Let's get you started
Note: Turning the group handle to the
centre position might be tight for the
first few uses.
Note: For the first few seconds the pump
will make a louder than usual noise as it
begins pumping the water through.

Related product manuals