Sungrow SG5K-D User Manual

Sungrow SG5K-D
95 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
SG2-6K-UEN-Ver14-202003 Version1.4
User Manual
SG2K-S / SG2K5-S / SG3K-S /
SG3K-D / SG3K6-D / SG4K-D /
SG4K6-D / SG5K-D / SG6K-D
PV Grid-Connected
Inverter

Table of Contents

Other manuals for Sungrow SG5K-D

Question and Answer IconNeed help?

Do you have a question about the Sungrow SG5K-D and is the answer not in the manual?

Sungrow SG5K-D Specifications

General IconGeneral
Rated AC Output Power5000 W
Max. Efficiency98.4%
Operating Temperature Range-25°C to +60°C
Max. DC Power6000 W
Number of MPPTs2
Max. AC Power5500 VA
Rated AC Voltage230 V
AC Voltage Range180 V - 280 V
Rated Grid Frequency50 Hz / 60 Hz
Power Factor at Rated Power>0.99
THDi<3%
DC Connection TypeMC4
Protection DegreeIP65
Cooling MethodNatural convection
AC Connection TypePlug-in terminal

Summary

Safety Precautions

PV Panel Safety

Highlights dangers associated with PV panels, including lethal voltage and electric shock.

Inverter Safety Guidelines

Details safety measures for handling the inverter, including shock and burn risks.

Product Description and Features

Mechanical Mounting Instructions

Safety Precautions for Mounting

Details critical safety warnings and precautions to be followed before and during mounting.

Step-by-Step Inverter Installation

Provides detailed steps for mounting the inverter onto the wall bracket.

Electrical Connection Procedures

Electrical Connection Safety Instructions

Highlights critical safety warnings and personal protective equipment (PPE) for electrical work.

AC Cable Connection Procedure

Details how to connect the AC cable to the inverter and grid, including circuit breaker specifications.

DC Cable Connection Procedure

Highlights safety and requirements for connecting DC cables from PV arrays to the inverter.

Inverter Commissioning Procedures

Pre-Commissioning Inspection Checklist

Lists essential checks to perform before starting the inverter commissioning process.

Commissioning Startup and Settings

Details the startup, country selection, parameter settings, and detection process.

LCD Operation and Interface

System Decommissioning Procedures

Disconnecting the Inverter Safely

Provides step-by-step instructions for safely disconnecting the inverter from power sources.

Troubleshooting and Maintenance

Troubleshooting Common Issues

Provides guidance on diagnosing and resolving common faults indicated by LED or screen messages.

Inverter Maintenance Procedures

Outlines safety precautions and procedures for performing maintenance on the inverter.

Related product manuals