EasyManua.ls Logo

Sunny SF-E2310 - Assembly Instructions; Step 1: Remove Shipping Tubes

Sunny SF-E2310
14 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
ASSEMBLY INSTRUCTIONS
1
76
10
76
10
105
104
STEP: 1
Unscrew Screws (No. 76) and Washers (No. 10) using Allen Wrench (S6) then,
remove and discard the Front and Rear Shipping Tubes (No. 104 and No. 105).
NOTE: You may save these parts; Screws (No. 76), Washers (No. 10), Front and
Rear Shipping Tubes (No. 104 and No. 105), for future packaging and transportation
of the bike if desired.