EasyManua.ls Logo

Sunstream FL-24020D - Solar, Fluid, and Ice Maintenance; Repair, Boat Fit, and Float Removal; Pre-Use Inspection Checklist

Sunstream FL-24020D
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PART NO. 690809 REV: A 27
Solar Panels
Keep solar panels clean to maintain charging output.
SunFluid
Replace SunFluid from reservoir every 4 years. Drain plug is located under powerpack. Rinse reser
voir with water when empty, and allow to dry before refilling. Use approx. 5 gallons of Sunstream
SunFluid to fill. Only use Sunstream SunFluid, part number VL-SF-GAL (1 gal), or VL-SF-5GAL (5
gal)
Ice
Shifting thick ice can cause damage to floats and frame. Use ‘bubbler’ to prevent ice build-up
around lift.
FloatLift repair
Repairs to FloatLift should only be performed by certified Sunstream technician or as authorized by
Sunstream. Call Sunstream at 253-395-0500 for repair and/or repair instructions.
For the fastest service of hydraulic and electrical systems, it is recommended to have a spare Power-
pack on hand, swap out powerpack that is experiencing trouble, and arrange for non-emergency service
for repair.
Intended boats
The FL24, FL36 & FL40 were designed to fit most boats up to the FloatLifts maximum capacity, and
beam widths up to 13’ 9”. Use caution to verify bunks fit boat appropriately, and boat is capable of
being supported in this configuration. Some boats may require specialized bunk kits or bunk adjust-
ment. Contact Sunstream and/or boat mfg if needed. Use caution when first lifting, and inspect for
proper fit. Bunks of FloatLift should only contact hull, and not hull fittings or any component that may
be damaged. For inboard boats, use caution for propeller and shaft clearance. Bunks may need to be
raised for boats with low shafts to clear V-beam structure of FloatLift frame structure.
Removing/installing float assemblies
The port and starboard float assemblies can be removed for more compact shipping and storage. To
remove each float assembly, remove two lower pivot pins on each side (three pins on FL36 & FL40).
Then re-install, replace pin and locking ring. Float assemblies may be lifted with a forklift from center
of float assembly.
Inspection every time the float lift is used
Confirm that:
FloatLift is properly secured with dock lines, free of chaffing points. Adjust dock lines and use
fendering as needed.
FloatLift is free of obstructions, and clear of people
Fluid Level in Powerpack is ok. Fluid needs to be approx 1” from top of reservoir , when lift is
fully raised
Clean solar panels, and confirm they are in direct sunlight.
Waterline indicator labels on floats are above waterline
Maintenance

Related product manuals