PART NO. 690809 REV: A 36
Roller assembly and Roller Plates – 3 Minutes
Inspect wheels. Outside surface should be smooth
Grease axles if rollers make noise or aren’t rolling smoothly
Inspect roller plates for wear or corrosion
Comments____________________________________
Castings – 5 minutes
Pivot pins on top and bottom in place and secured with retaining ring
Check for evidence of corrosion, cracking or other wear (may need to remove marine growth to in-
spect). Pay special attention to water line area.
Comments____________________________________
Attachment to Pier – 5 minutes
Inspect all dock lines for chafing or wear
Ensure tie up method does not allow chafing of hoses
Ensure tie up method does not allow floats to be chafed or punctured
Ensure rope positioning and number conform to Sunstream standards
Comments____________________________________
Zincs –10 minutes
Inspect zincs. Each zinc should have at least 50% of its original mass
Fastening screws tight zinc
If replacing zinc, clean attachment area first
Clean outside surface of zinc of any marine growth
Comments____________________________________
Inspected by________________________ on ________________
Sunstream FL24, FL36 & FL40 annual Inspection (in addition to 6-month inspection)
Zincs: Replace zincs annually with Sunstream zinc kits (GFA-ZN24 for FL24) & (GFA-ZN36 for FL36 & FL40)
Check electrical potential of structural aluminum to be more than 900mV in salt water
Batteries: Check battery condition and replace batteries every 3 years, or as needed
Fluid: Replace SunFluid every 4 years
Inspection Checklists