1D-56 Engine Mechanical:
Gear Position Switch
• Install the springs and switch contacts.
• Install the gear position switch (1).
• Apply a bond lightly to the groove of the lead wire
grommet.
: Sealant 99000–31140 (SUZUKI BOND
No.1207B or equivalent)
Transfer Gearshift System
Install the transfer related parts. Refer to “Transfer
Removal and Installation (LT-F400/F) in Section 3C
(Page 3C-7)”.
Starter idle Gear
• Install the starter idle gear No.1 (1) and No.2 (2).
Generator cover
• Install the dowel pins and new gasket (1).
• Install the generator cover.
NOTE
Fit the clamp to the bolt “A”. Refer to “Wiring
Harness Routing Diagram in Section 9A
(Page 9A-8)”.
1
I827H1140207-01
I827H1140208-01
I827H1140269-01
1
2
I827H1140216-01
1
I827H1140217-01
“A”
I827H1140218-01