EasyManua.ls Logo

Suzuki LT-F400F - Page 130

Suzuki LT-F400F
502 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1D-56 Engine Mechanical:
Gear Position Switch
Install the springs and switch contacts.
Install the gear position switch (1).
Apply a bond lightly to the groove of the lead wire
grommet.
: Sealant 99000–31140 (SUZUKI BOND
No.1207B or equivalent)
Transfer Gearshift System
Install the transfer related parts. Refer to “Transfer
Removal and Installation (LT-F400/F) in Section 3C
(Page 3C-7)”.
Starter idle Gear
Install the starter idle gear No.1 (1) and No.2 (2).
Generator cover
Install the dowel pins and new gasket (1).
Install the generator cover.
NOTE
Fit the clamp to the bolt “A”. Refer to “Wiring
Harness Routing Diagram in Section 9A
(Page 9A-8)”.
1
I827H1140207-01
I827H1140208-01
I827H1140269-01
1
2
I827H1140216-01
1
I827H1140217-01
“A”
I827H1140218-01

Table of Contents

Other manuals for Suzuki LT-F400F

Related product manuals