EasyManua.ls Logo

swaploader SL-214 - Page 63

swaploader SL-214
106 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Section III: Operation
3.0.OPE.SL-214
CHANGING HOOK HEIGHT: 54” TO 36” JIB HEIGHT ADJUSTMENT PROCEDURE
(cont’d)
STEP 4. WITH THE TELESCOPIC JIB FULLY EXTENDED IN THE TRANSPORT POSITION (AS SHOWN); REPLACE THE
LOCK PIN AND SECURE WITH HITCH PIN.
WARNING:
DO NOT REMOVE LOCK PIN ON THE ADJUSTABLE JIB WHILE JIB IS IN THE 54” HOOK POSITION AND
THE TELESCOPIC ARM IN TRANSPORT POSITION (AS SHOWN). POSSIBLE PROPERTY DAMAGE AND/OR
PERSONAL INJURY MAY RESULT.
3-7

Related product manuals