5.17 Control equipment
Beside these general instructions also apply to the instruc-
tions from the manufacturer.
General
All installations should be made not blocking or interfering
inspection doors or function parts. All electrical connec-
tions are to be made in accordance with valid interna-
tional, national and local regulations and guidelines.
Commissioning
Commissioning are to carried out by authorized personel.
• Check that all equipment is properly mounted.
• Check power supply to the electrical cubicle.
• Check that components work properly.
• Configure control functions and monitoring in accord-
ande to the project plan.
• Make necessary settings and adjustings..
• Check programming.
• Check all safety functions.
• Educate operation&maintenance personel.
5.16 Cleaning
Appropriate cleaning agent should be used according to
the material of the components.
Following material is used as standard:
Housing Panels, doors,
framework
Sendzimir galvanised steel
with Anti-Finger print coa-
ting
Damper Damper blades Warmgalvanised steel
Cooler, humidifier
and more
Drainpan Stainless steel
Heating coils Fins
Pipework
Aluminium or Cupper
Cupper
Cooling coils Fins
Pipework
Aluminium or warmgalvani-
sed steel
Warmgalvanised steel
Cross flow plate and
rotary heat exchan-
ger
Channels Aluminium
EN.SILVER.110322
The company reserves the right to make design changes without prior notice.
24 www.swegon.com