Activity Action
Months
1 3 6 12 24
15 Control equiment
Checking should be made the first time after 6 months in operation, thereafter at least byt intervals of 12 months.
Electrical cubicle, control functions, user terminals
15.1
Check that all equiment is properly mounted.
Fix if required
x
15.2
Check all equpiment regarding contamination,
corrosin and damage
Clean and repair/replace
x
15.3
Check safe protections x
15.4
Check all connections and fastenings
Fix if required
x
15.5
Check the function of all movable equpiment,
i.e. damper motors, pumps etc
Fix if required
x
15.6
Check the function of all sensors and safetey
arrangements, i.e. frost protection and safety
valves
Fix if required
x
15.7
Check terminals and read off components
Fix if required
x
15.8
Check settings, i.e switch clock
Fix if required
x
Set values, regulation functions
15.9
Measure and check input signals according to
set values
Fix if required x
15.10
Measure and check electric, electronic and
phneumatic signals and functions
Fix if required x
15.10
Measure and check physical values, i.e. tem-
peratures, air flows etc
Fix if required x
15.11
Set up a protocol x
Mjukvara
15.12
Make backup/safety copy x
15.13
Check if updatings are available Update x