EasyManua.ls Logo

Sym JOYRIDE 125 - Precautions in Operation

Sym JOYRIDE 125
275 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18. Electrical System
18-2
Precautions in Operation
When remove the battery, the disconnection sequence of cable terminals shall be strictly
observed. (First disconnect the negative cable terminal, next, the positive cable terminal.)
The model of the spark plug and the tightening torque.
The ignition timing.
Adjustment of headlamp.
Removal and installation of AC generator.
The maintenance free battery requires no inspection of electrolyte level and refilling of distilled
water.
To recharge the battery, remove the battery from rack without removing ventilation caps.
Unless in emergency, never rapid charge the battery.
The voltage must be checked with the voltmeter while charging the battery.
As ECU does not require an ignition timing check. In case ignition timing is incorrect, check AC
generator. Verify with an ignition timing lamp after replacement if necessary.
Starter motor should be removed after the engine being removed from the frame.
Specification
Charging system
Item Specification
Capacity 12V 8Ah
Battery
Charging rate 0.9A / 5~10hr (standard) 4A / 1hr (rapid)
Leaking current Below 5 mA
Charging current 1.2A / 1600 rpm
Charging control val. 14.5+0.5 V / 2000 rpm
Ignition system
Item Specification
Type NGK CR7E recommended)
Spark plug
Gap 0.8 mm
Resistance First winding
0.63±0.03Ω(27C)
CPS sensor resistance
120±10%Ω
10° BTDC / 1000 rpm
13° BTDC / 1600 rpm
Ignition time
24° BTDC / 6000 rpm
To this chapter contents

Table of Contents

Other manuals for Sym JOYRIDE 125

Related product manuals