Issued June 2017 Page 1 of 6
TA Instruments
Packing the TMA Q400
This procedure covers the steps for properly packing up the TMA Q400 for shipment.
Packing Procedure
1 Remove the probe and stage from the instrument
2 Remove the outer cover around the shuttle assembly.
3 Remove the weight tray. Tape the nylon screw in place and lay the weight tray in the top of the furnace.
See Figures 1 and 2.
Figure 1
Question and Answer IconNeed help?

Do you have a question about the TA Instruments TMA Q400 and is the answer not in the manual?

TA Instruments TMA Q400 Specifications

General IconGeneral
ModelTMA Q400
Force Range0.001 to 1 N
Displacement Resolution0.1 nm
Frequency RangeNot applicable
Measurement ModesExpansion, Penetration, Tension, Flexure
AtmosphereAir, Nitrogen, Argon
Cooling SystemLiquid Nitrogen
Temperature Range-150°C to 1000°C

Summary

Packing Procedure

Remove Probe and Stage

Remove the probe and stage from the instrument.

Remove Outer Cover

Remove the outer cover around the shuttle assembly.

Prepare Weight Tray

Remove the weight tray and tape the nylon screw in place.

Remove Front Support Screws

Remove the 8 shoulder screws from the front support bracket.

Position Front Support Bracket

Slide the front support bracket between the upper and lower suspensions.

Position Rear Supports

Slide the rear supports between the upper and lower suspensions.

Install Shoulder Bolts

Install shoulder bolts through the front support bracket into the rear support brackets.

Install Outer Clamp

Install the outer clamp above and below the upper and lower suspensions.

Immobilize Suspension

Install the outer clamp bolt and tighten to immobilize the suspension.

Install Shipping Foam

Install the rear shipping foam support under the lower weights.

Lower Furnace and Secure Tray

Lower the furnace and tape the weight tray into the top of the furnace.

Place Cardboard Sleeve

Place the cardboard sleeve over the furnace lift shaft.

Immobilize Furnace with Cap

Tighten the lockdown cap into the furnace lift shaft to immobilize the furnace.

Operate Control Panel

Press the Control button on the Q400 display panel.

Initiate Shutdown Sequence

Press Shutdown, then Apply, and wait for confirmation of safe shutdown.

Power Off Instrument

Turn off the power switch located on the back of the instrument.

Secure Unit on Pallet

Bolt the Q400 down onto the shipping pallet and cover with the cardboard box.

Secure Cardboard Box

Strap the cardboard box securely over the pallet and instrument.

Finalize Packaging

Seal the box and affix the green return label to the top.