EasyManua.ls Logo

Tait TN9275 - Subrack Handling

Tait TN9275
155 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TB9400/TN9275 Installation and Operation Installation 59
© Tait International Limited May 2023
4.2 Unpacking and Moving the Subrack
The subrack is packed in a strong corrugated cardboard carton with top and
bottom foam cushions. To prevent personal injury and damage to the
equipment, we recommend that two people unpack and move the subrack.
To remove the subrack from the carton, follow the procedure illustrated in
Figure 4.2.
Caution A subrack complete with modules can weigh up to 55lb
(25kg), or up to 62lb (28kg) complete with packaging. We recommend
that you have another person help you unpack and move the equipment.
The TBAA03-16 carrying handles will make it easier to move the
equipment once it has been unpacked. If necessary, remove the modules
from the subrack before moving it (refer to “Replacing Modules” on
page 123). In all cases follow safe lifting practices.
1. Cut the tape securing the flaps at the top of the carton and fold them
flat against the sides
b.
2. Rotate the carton carefully onto its side
c and then onto its top d,
ensuring that none of the flaps is trapped underneath.
Figure 4.2 Unpacking the subrack
b
e
g
f
hi
cd

Table of Contents