Model 490 Operator Training
Controls Operating Procedures Troubleshooting Quiz
Quit
Home
Operating
Procedures
Priming
Assembly
Sanitizing
Draining
Cleaning
Priming
Disassembly
Brush Cleaning
Rinsing
Operating Procedures
Step 5
Fill the hopper with mix.
Step 6
Place the control switch in the
“AUTO” position. Rotate the
draw valve away from the
draw arm. Lift the draw arm to
start the compressor.
Rotate the draw valve back to
its normal position on the
draw arm. When the unit
cycles off, the product will be
at serving temperature.
Step 7
Place the mix hopper cover in
position.
Note: When drawing product,
gently raise the draw arm to
the fully opened position.