Model 490 Operator Training
Controls Operating Procedures Troubleshooting Quiz
Quit
Home
Operating
Procedures
Assembly
Assembly
Sanitizing
Draining
Cleaning
Priming
Disassembly
Brush Cleaning
Rinsing
Operating Procedures
Step 5
Make sure the beater
assembly is in position over
the drive shaft. Turn the beater
slightly to be certain that the
beater is properly seated.
When in position, the beater
will not protrude beyond the
front of the freezing cylinder.