4. If the measurement is outside the specified limits, there is a
possibility of a shock hazard. The equipment should be repaired
and rechecked before it is returned to the customer.
5. Caution for AC Mains Lead
6. Operation Checks and Component Replacement
Procedures
- This section describes procedures for checking the operation of
the major printed circuit boards and replacing the main
7