EasyManua.ls Logo

TechnipFMC TRIPLEX M06 User Manual

Default Icon
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Doc No: OMM50001243
Rev: C Page 1 of 68
This document and all the information contained herei
n are the confidential and exclusive property of TechnipFMC,
and may not be reproduced, disclosed, or made public in
any manner prior to express written authorization by TechnipFMC.
OPERATION AND MAINTENANCE MANUAL, M06 & M09 TRIPLEX
PUMPS
Rev
ECN No.
Date
Reviewed By
Approved By
Status
C
5044404
07-NOV-2017
Rothe, Michael
McClain, Mathew
RELEASED
Summary:
This is a manual for FMC M06 and M09 triplex plunger pumps. These pumps have a
stroke length from 1.50 inches to 2.25 inches and a maximum continuous duty power
rating from 16.6 horsepower (12.4 kilowatts) to 26 horsepower (19.4 kilowatts). Refer to
part number 5266227 for printing information.

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the TechnipFMC TRIPLEX M06 and is the answer not in the manual?

TechnipFMC TRIPLEX M06 Specifications

General IconGeneral
BrandTechnipFMC
ModelTRIPLEX M06
CategoryWater Pump
LanguageEnglish

Summary

Operation and Maintenance Manual, M06 & M09 Triplex Pumps

Summary

Overview of FMC M06 and M09 triplex plunger pumps, including stroke length and power rating.

1.0 Important Safety Instructions

2.0 M06 Pump Features

3.0 Storage Instructions

3.1 Short Term Storage

Guidelines for storing the pump for less than six months in a temperature-controlled environment.

3.2 Short Term Storage for Severe Environments

Procedures for short-term storage in harsh or severe environmental conditions.

3.3 Long Term Storage

Detailed instructions for storing the pump for periods exceeding six months.

3.4 Returning a Stored Pump to Operation

Steps to safely return a pump from storage back into operational service.

3.5 Precautions during Freezing Weather

Measures to prevent damage from freezing when storing or operating the pump.

4.0 Installation Guidelines

4.1 General Location

Recommendations for selecting a suitable and safe location for pump installation.

4.2 Mounting Pump to Foundation and Power Source

Instructions on how to properly mount the pump to its foundation and power source.

4.3 Suction Piping Recommendations

Best practices for designing and installing suction piping for optimal pump performance.

4.4 Discharge Piping Recommendations

Guidelines for routing and sizing discharge piping to ensure efficient pump operation.

4.5 Multiple Pump Systems

Considerations for operating multiple pumps connected to common piping systems.

5.0 How to Start a Pump

Start-up Checklist

A comprehensive checklist for ensuring a pump is ready for start-up.

6.0 Lubrication of Power End

6.1 Recommended Lubricants

Guidance on selecting appropriate lubricants for the pump's power end.

6.2 Oil Changes

Recommended intervals and procedures for performing oil changes in the power frame.

7.0 Inspection and Preventative Maintenance Chart

8.0 Estimated Life of Wearing Components

9.0 Component Parts List

10.0 Service Procedures

10.1 Replacing Plunger Packing

Step-by-step instructions for replacing the plunger packing in the pump.

10.2 Removing the Fluid Cylinder

Procedure for safely removing the fluid cylinder for inspection or replacement.

10.3 Replacing Valves

General instructions for replacing disc and AR type valves in the pump.

10.3.1 Replacing AR Valves

Detailed steps for the removal and installation of AR (Abrasion Resistant) valves.

10.3.2 Replacing Disc Type Valves

Instructions for removing and installing disc type valves in the pump.

10.3.3 Valve Removal and Installation Tools

Guide to available tools for the removal and installation of pump valves.

10.4 Servicing the Power End

10.4.1 Replacing Plunger Rod Oil Seals and Plunger Rods

Procedure for replacing oil seals and plunger rods in the power frame.

10.4.2 Servicing the Connecting Rod Bearings

Steps for inspecting and servicing the connecting rod bearings.

10.4.3 Servicing Bearing Housings, Crankshaft, and Crossheads

Detailed procedure for servicing bearing housings, crankshaft, and crossheads.

11.0 Fastener Torque Requirements

12.0 Critical Clearances

13.0 Trouble-Shooting Pumps

14.0 Ordering Parts

15.0 Glossary of Commonly Used Terms

16.0 Reference Information

17.0 Maintenance Records

17.1 Check List for Starting a Pump

A comprehensive checklist for ensuring a pump is ready for start-up.

17.2 Maintenance Log

Logbook for recording all maintenance performed on the pump.