08:30
3 - POWER UP THE SYSTEM
CAUTION: power up the electrical equipment only after the
minipool has been filled with water.
Position the isolating switch (fitted during installation) to ON.
Check the smooth operation of the residual current switch,
wired up during preinstallation, by pressing the test button.
The switch should trip.
Reset the switch following the test.
The recirculation pump will start up automatically.
Start up the whirlpool systems by pressing buttons Pump1
and Pump2 at the control panel.
Open all the jets, checking that there are no water leaks
from the plumbing connections, and that everything works
as it should; the pumps can now be switched off.
4 - WATER TREATMENT
Treat the water using the products supplied by Teuco, as
described in the accompanying manual.
Other equivalent proprietary products can also be used.
Check that the pH value of the water is between 7.2 and
7.6 and the quantity of chlorine between 1 and 1.5 ppm.
The pH value and Chlorine level must be tested chemically
at frequent intervals to guarantee the quality of the water is
properly maintained and ensure correct operation of the
system.
1 - REMOVE THE CANVAS FROM THE MINIPOOL
Unhook the retaining straps at the four corners of the pool
to remove the canvas.
2 - FILL THE MINIPOOL
Fill the minipool with water to the level indicated on the
skimmer.
AM
The water put into the pool must be no hotter
than 35 °C.