EasyManua.ls Logo

Textron Ransomes Parkway 2250 Plus - Operating the Machine - Pre-Operation; Daily Pre-Operation Inspection

Textron Ransomes Parkway 2250 Plus
34 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GB-18
RANSOMES PARKWAY 2250 PLUS
SAFETY AND OPERATORS MANUAL
7 OPERATION
The daily inspection should be performed
only when the engine is off and all fluids
are cold. Lower implements to the
ground, engage parking brake, stop
engine and remove ignition key.
CAUTION
7.1 DAILY INSPECTION
1. Perform a visual inspection of the entire unit, look for signs of wear, loss hardwear and missing or
damaged components. Check for fuel and oil leaks to ensure connections are tight and hoses and
tubes are in good condition.
2. Check the fuel supply, radiator coolant level, crankcase oil level and air cleaner indicator. All fluids
must be at the full mark with the engine cold.
3. Make sure all cutting units are adjusted to the same height of cut.
4. Check all tyres for proper inflation.
5. Test the operator presence and safety interlock system.

Table of Contents

Related product manuals