TS 870 Transfer Switch
PM062 REV 11 16/04/19 3 Thomson Power Systems
13. REQUIREMENTS FOR UPSTREAM CIRCUIT PROTECTIVE DEVICES 51
13.1. WITHSTAND CURRENT RATINGS (ALL MODELS WITHOUT INTEGRAL
OVERCURRENT PROTECTION OPTION) 51
13.2. INTERRUPTING CAPACITY CURRENT RATINGS (ALL MODELS WITH INTEGRAL
OVERCURRENT PROTECTION OPTION) 52
14. GROUND FAULT SITE TEST REQUIREMENTS 52
14.1. PERFORMANCE TEST 52
15. TROUBLESHOOTING 53
16. REPLACEMENT PARTS 58
17. PRODUCT RETURN POLICY 60
18. NOTES 61
19. PERFORMANCE TEST FORM 62
APPENDIX A – TYPICAL TS 870 ATS COMMISSIONING PROCEDURE
APPENDIX B – TS 870 SYSTEM VOLTAGE CHANGE PROCEDURE
APPENDIX C –SEISMIC CERTIFICATE