TS 870 Transfer Switch
PM062 REV 11 16/04/19 62 Thomson Power Systems
19. PERFORMANCE TEST FORM
This form should be retained by those in charge of the building electrical installation in order to be
available to the authority having jurisdiction.
Date Personnel Tests performed Comments
Interconnection evaluation
Grounding point evaluation
Fault current test:
Ground fault settings -
______________________________
Simulated current -
______________________________
Results -
______________________________