EasyManua.ls Logo

TidalFit EP-15 - Page 27

Default Icon
81 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Place 1 bag in each corner and 1 in the middle of each long side. This will
allow you to remove the straps on the spa is in position. Allow the ice to
melt and then the spa will be ready for back ll with gravel
In a at application: Use gravel NOT dirt. Using dirt you have to compact
it, this will create unruly pressure on the spa. Gravel gives you about 98%
compaction just by pouring it in the void (overdig). then you can pour your
concrete decking. If a wooden deck is being built there is no real need to
backll except to keep the ground from around the spa from erodings.
3.5 in.
Concrete
Deck
SPA
Gravel 1/2 in.
Washed
6 in. CONCRETE PAD WITH FIBER
TIDALFIT SEMI IN-GROUND INSTRUCTIONS
21

Table of Contents

Other manuals for TidalFit EP-15

Related product manuals