DVIR Installation
STEP 1
Screw the Plenum-Inlet Assembly into place through the sides.
Note: Plenum-Inlet Assembly is mounted before the wall board is fixed
STEP 2
Install the Mounting frame-Distributor assembly to the wall board
using screws.
STEP 3
Install front cover onto the Mounting frame-Distributor assembly.
Commissioning (Balancing): Uninstall the front cover for commissioning.
The balancing port is positioned on the lower edge of the unit. The K-factor
of the unit is stated on K-factor label placed on one of the side of the
Plenum box. The k-factor can also be found on our website in the relevant
k-factor guide. See Figure 4