EasyManua.ls Logo

Toro 22470 - Adjusting Digging Chain Tension; Flipping a Worn Boom

Toro 22470
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2.Stoptheengineandremovethekey.
3.Cleantheareaaroundthebearingcasellholeplug
(Figure10).
G008940
1
Figure10
1.Bearingcasellholeplug
4.Removetheplugfromthebearingcasellhole
(Figure10).
5.Lookinthehole,thelevelshouldbeuptothe
bottomofthehole;ifnotaddgearlubeuntilit
comesoutofthehole.
6.Replacetheplugandtorqueitto15to17ft-lb(20
to23N-m).
ChangingtheGearLube
1.Cleantheareaaroundthebearingcasellholeplug
(Figure10).
2.Removetheplugfromthebearingcasellhole
(Figure10).
3.Liftthetrencheruntiltheboomisvertical,draining
thelubethroughthellholeandintoapan.
4.Returnthetrenchertotheground.
5.Fillthebearingcasewithgearlubeuntilitcomes
outofthellhole.
6.Replacetheplugandtorqueitto15to17ft-lb(20
to23N-m).
AdjustingDiggingChain
Tension
ServiceInterval:Every25hours
Withthetrencherparalleltotheground,ensurethat
thereare1-1/2to2-1/2inches(3.8to6.3cm)between
thebottomoftheboomandthetopofthebottom
chainspan.Ifnot,adjustthechainusingthefollowing
procedure:
Important:Donotovertightenthechain.Excess
chaintensionmaydamagedrivecomponents.
1.Loosenthe2boltsandnutssecuringtheboomto
thetrencherarm(Figure3).
2.Loosenthejamnutsecuringtheadjustmentbolt
(Figure3).
3.Turntheadjustmentboltinoroutasneededto
achievethedesiredtension.
4.Tightenthejamnut.
5.Torquethe2boltsandnutssecuringtheboomto
135to165ft-lb(183to223N-m).
FlippingaWornBoom
ServiceInterval:Every25hours
Inspectthebottomoftheboomforwear,ifitisworn,
completethefollowing:
Note:Ifyouhavealreadyippedtheboomonce,
replacetheboomwhenbothsidesareworn.
1.Removethe2boltsandnutssecuringtheboomto
thetrencherarm(Figure3).
2.Loosenthejamnutontheadjustingboltinthe
boom(Figure3).
3.Loosentheadjustingboltuntilyoucanremovethe
chainfromtheboom(Figure3).
4.Removethechainfromthedrivesprocket.
5.Removetheboom,ipitoversothebottom
becomesthetop(orifyouhavealreadyippedit
once,replaceit),andinstalltheboomagain.
6.Replacethenuts,bolts,andwasherssecuringthe
boom.
7.Installthechainoverthedrivesprocketandfront
roller.
8.AdjustthechaintensionasdescribedinAdjusting
theDiggingChainTension.
12

Related product manuals