EasyManua.ls Logo

Toro 22470 - Replacing the Digging Teeth; Replacing the Drive Sprocket

Toro 22470
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ReplacingtheDiggingTeeth
ServiceInterval:Beforeeachuseordaily
Duetothehighamountofwearplacedonthedigging
teeth,youwillneedtoreplacethemperiodically.
Toreplaceasingletooth,removetheboltssecuringthe
toothtoremoveit,theninstallanewtoothinthesame
position.Torquetheboltssecuringtheteethto27to33
ft-lb(37to45N-m).
ReplacingtheDriveSprocket
Overtime,thedrivesprocketwillwear,especiallywhen
usedinsandyorclaysoils.Whenthishappens,the
diggingchainwillbegintoslip.Ifthechainslips,replace
thedrivesprocket,asfollows:
1.Raisethetrencherafewinchesabovetheground.
2.Stoptheengineandremovethekey.
3.Removethespoilsauger(Fig.8).
G008941
123
Figure11
1.Spoilsauger
3.Bolts
2.Drivesprocket
4.Loosenthe2boltsandnutssecuringtheboomto
thetrencherarm(Fig.2).
5.Loosenthejamnutontheadjustingboltinthe
boom(Fig.2).
6.Loosentheadjustingboltuntilyoucanremovethe
chainfromtheboom(Fig.2).
7.Removethechainfromthedrivesprocket.
8.Removethe6boltssecuringthedrivesprocket(Fig.
8).
9.Removeanddiscardthedrivesprocket(Fig.8).
10.Cleanthesprocketmountingsurfaceonthetrencher.
11.Slidethenewsprocketontotheshaftasillustrated
inFigure8.
Important:Thearrowonthesprocketface
shouldbevisiblefromtherightsideofthe
trencherandshouldpointinaclockwise
direction;ifnot,turnthesprocketaround.
12.Threadthe6boltsintothesprocketngertight(Fig.
8).
13.Slowlybegintighteningtheboltsprogressingaround
thesprocketuntilallboltsaretorquedto95to115
ft-lb(129to155N-m).
Important:Tighteneachboltonlyhalfway
rst,workingyourwayaroundthesixbolts,
thenreturntoeachboltinturnandtorquethem
tothespecicationsgiveninstep13.
14.Loopthechainovertheaugerdriveshaftandonto
thedrivesprocket,ensuringthattheteethpoint
forwardontheupperspan.
15.Settheupperspanofthechainintoplaceonthe
trencherboom,thenwrapthechainaroundthe
rollerattheendoftheboom.
16.Threadtheadjustmentboltintotheboomandturn
itinuntilthereis1-1/2to2-1/2inches(3.8to6.3
cm)ofslackinthechainonthebottomspan.
17.Threadthejamnutdowntheadjustingboltand
tightenitsecurelyagainsttheboom.
18.Torquethe2boltsandnutssecuringtheboomto
135to165ft-lb(183to223N-m).
19.Installthespoilsauger;refertoInstallingtheSpoils
Auger.
13

Related product manuals