EasyManua.ls Logo

Toro 23210 - 1 Installing the Grinder Control Lever; 2 Checking Fluid Levels; Setup; 3 Charging the Battery

Toro 23210
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Setup
LooseParts
Usethechartbelowtoverifythatallpartshavebeenshipped.
ProcedureDescription
Qty.
Use
Grindercontrollever
1
1
Jamnut1
Installthegrindercontrollever.
2
Nopartsrequired
Checktheuidlevels.
3
Nopartsrequired
Chargethebattery.
1
InstallingtheGrinderControl
Lever
Partsneededforthisprocedure:
1
Grindercontrollever
1Jamnut
Procedure
1.Threadthejamnutontothegrindercontrollever
(Figure4).
Figure4
1.Grindercontrollever
3.4-pinconnector
2.Jamnut
2.Threadthegrindercontrolleverintotherecepticle
onthecontrolpanel(Figure4).
3.Withthetriggerorientedforward,tightenthejam
nutagainstthereceptacletosecuretheleverinplace
(Figure4).
4.Connectthewireonthelevertothe4-pinconnector
underthecontrolpanel(
Figure4).
2
CheckingFluidLevels
NoPartsRequired
Procedure
Beforestartingtheengineforthersttime,check
theengineoilandhydraulicuidlevels;referto
CheckingtheEngineOilLevel(page16)and
CheckingtheHydraulicFluidLevel(page16)formore
information.
3
ChargingtheBattery
NoPartsRequired
Procedure
Chargethebattery;referto
ChargingtheBattery(page29)formoreinformation.
11

Table of Contents

Other manuals for Toro 23210

Related product manuals