EasyManua.ls Logo

Toro Reelmaster 6500–D - Page 179

Toro Reelmaster 6500–D
366 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Reelmaster 6500D/6700–D
Page 4 91
Hydraulic System
28. Put the metering package, drive plate side first, into
the metering ring (Fig. 109). Revolve the input shaft or
metering package until the hole in the drive plate en-
gages the end of the input shaft and the drive plate is
seated on the thrust bearing. When properly seated, the
metering package will be below the surface of the meter-
ing ring.
29. Apply clean multipurpose grease on the new com-
mutator seal and put it into the commutator cover seal
groove (Fig. 110). The rubber portion (the softer side) of
the seal with the yellow mark must be put into the seal
groove.
30. Apply clean multipurpose grease to the metering
ring seal ring. Put the seal ring into the metering ring seal
ring groove (Fig. 111).
Figure 109
Figure 110
Figure 111
Hydraulic
System

Table of Contents

Other manuals for Toro Reelmaster 6500–D

Related product manuals