ParkBrakeHandleAssemblyInstallation
1.Connecttheupperbrakelinkagetothebrakeshaft.
2.Withtheparkbrakehandlehardwareorientatedasshown,installthe
(0.375-16x1.500inch)screwand(3/8-16inch)angenut.
3.Withtheparkbrakeshaftindisengagedpositionandtheparkbrakeleverin
thelowerposition,rotatetheupperbrakelinkageuntiltheendalignswiththe
holeintheparkbrakelever.
4.Securewithalockingcotterpin.
5.Cycletheparkbrakelevertoensurethatitlocksintheengagedposition.
6.Installtheleftconsole.LeftConsoleRemoval(page5–13)
7.Connectthebatterybyinstallingthepositivecablerst,thenthenegative
cabletothebattery.
8.Verifytheproperfunctionoftheunit.
MotionControlAssemblyReplacement
MotionControlAssemblyRemoval
1.ParkthemachineonalevelsurfaceanddisengagethePTO.Stoptheengine,
waitforallmovingpartstostop,andremovekey.Engagetheparkingbrake.
2.Disconnectthebatterybyremovingthenegativecablerst,thenthepositive
cablefromthebattery.
3.Removetheleftandrightconsoles.LeftConsoleRemoval(page5–13)
RightConsoleRemoval(page5–16)
4.Raiseandsupporttheunitsothatthefrontwheelsareofftheground,block
rearwheels.
5.Removethe2(3/8-16X1.00inch)screwssecuringthemotioncontrolhandle
tothemotioncontrolassembly.
6.Removethe(5/16-18inch)shoulderscrewsecuringthemotioncontrol
damperfromthemotioncontrolassembly.
7.Disconnectthemotioncontrollinkagefromthetransmission.
g336043
Figure60
8.Disconnectthemotioncontrolassemblyfromtheframe.
TITAN®MaxServiceManual
Page5–31
Chassis:ServiceandRepairs
3442-428RevA