ChokeControlAssemblyInstallation(continued)
g321454
Figure47
3.Attachthechokecableassemblytothecontrolpanelwiththejamnut.
4.Installthecontrolpanelassemblyintotheconsole.
5.Movethechokecontrollevertotheopenposition(down).
6.Placethezbendofthechokecableinthechokeplateontheengineinthe
positionpreviouslynoted.
7.Placethecableunderthecableclamp.
8.Ensurethatthechokecontrolleverispresseddownfullyandtightenthe
cableclamp.
g323084
Figure48
9.Connectthebatterybyinstallingthepositivecablerst,thenthenegative
cabletothebattery.
TitanServiceManual
Page5–23
Chassis:ServiceandRepairs
3438-774RevA