EasyManua.ls Logo

Toro Z500 Series Z Master - Checking the Side Discharge Chute

Toro Z500 Series Z Master
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 27
3. Chec k the tensioning ar m for g rease
( Figure 28 ).
4. Chec k the g rease for the three spindle bearings
( Figure 28 ). If needed, add g rease until it
comes out of the lo w er seals .
Figure 28
5. Install the belt co v ers .
Step
11
Checking the Side Discharge
Chute
No Parts Required
Procedure
If there are plastic ties holding the side disc harg e
c hute up , remo v e them and lo w er the c hute into
place .
An unco v er ed discharge opening could
allo w the la wn mo w er to thr o w objects in the
operator’ s or bystander’ s dir ection and r esult
in serious injur y or death. Also, contact with
the blade could occur .
Nev er operate the la wn mo w er with the
g rass deflector r emo v ed unless y ou install a
co v er plate, a mulch plate, or a g rass chute
and catcher .
1. Mak e sure the L end of spring is installed
behind the dec k edg e before installing the bolt
as sho wn in Figure 29 .
2. Place the J hook end of spring around g rass
deflector ( Figure 29 ).
Important: T he g rass deflector must be
fr ee to r otate with do wnw ard tension. Lift
the deflector up to the full open position
and ensur e that it r otates fr eel y ,without
binding into the full do wn position.
10

Other manuals for Toro Z500 Series Z Master

Related product manuals