EasyManua.ls Logo

Toshiba e-STUDIO200L - Adjustment of Reverse Solenoid

Toshiba e-STUDIO200L
708 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
e-STUDIO200L/202L/230/232/280/282 ADJUSTMENT June 2004 © TOSHIBA TEC
3 - 64
3.10.7 Adjustment of reverse solenoid
When operating the reverse solenoid, adjust it if the position of the flapper lever is out of the following
dimension.
Gap between A of the front frame and the flapper lever “C”: 0.5 mm to 2.0 mm
<Procedure>
(1) Remove the screw on the left and take off the
plate spring.
Fig.3-71
(2) Align B of the front frame with the edge of the
reverse solenoid, and temporarily fix the
reverse solenoid with the screw on the right.
Fig.3-72
(3) While the plunger of the reverse solenoid is
put in the position to be turned ON (by press-
ing it in the direction of an arrow), loosen the
screw on the right to adjust the reverse sole-
noid so that the gap (C) between A of the
front frame and the flapper lever is 0.5 mm to
2.0 mm.
Fig.3-73
Plate spring
B
C
A

Table of Contents

Other manuals for Toshiba e-STUDIO200L

Related product manuals