EasyManua.ls Logo

Toshiba G9 ASD - Startup and Test

Toshiba G9 ASD
91 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
G9 ASD Quick Start Guide 23
Startup and Test
Before turning on the ASD ensure that:
R/L1, S/L2, and T/L3 are connected to the 3-phase input power.
U/T1, V/T2, and W/T3 are connected to the motor.
The 3-phase input voltage is within the specified tolerance.
There are no shorts and all grounds are secured.
All personnel are at a safe distance from the motor and the motor-driven equipment.
Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www.ctiautomation.net - Email: info@ctiautomation.net

Other manuals for Toshiba G9 ASD

Related product manuals