EasyManua.ls Logo

Toshiba HWS-802XWHM3-E - Page 83

Toshiba HWS-802XWHM3-E
146 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
–81–
7. HYDRO UNIT INSTALLATION MANUAL
Engineering Data Book
Water charging
Charge water until the pressure gauge shows 0.2 MPa (2 bar).
Hydraulic pressure may drop when the trial run begins. In that case, add water.
Air may enter if the charged hydraulic pressure is low.
Loosen the purge valve cap by two turns to release air.
Loosen the cap of the pressure relief valve to release air.
Water may come out of the pressure relief valve.
Release the air completely from the water circuit. Failure to do so may disable correct operation.
Water quality
The water used must satisfy EN directive 98/83 EC.
Piping insulation
It is recommended that insulation treatment be applied to all pipes. To perform optional cooling operation, apply
insulation treatment of 20 t or more to all pipes.
Fig. 7-18
Loosen 2 turns for
proper venting
19-EN

Table of Contents

Other manuals for Toshiba HWS-802XWHM3-E

Related product manuals