No. skrameR
1. Detachment
1) Following to work of Detachment of .
2) Cut the binding band (4 positions) on the back
surface
3) Pull the connector for PMV coil out of CDB P.C. board.
2. Attachment
Attach the PMV coil in the reverse process of
“1. Detachment”
1) Fix the coil positioning protrusions securely in the
concavities of the PMV body.
(Fix the coil in the direction where lead wire comes out
at the body’s left diagonally behind.)
2) Attach the PMV coil connector to the CDB P.C. board.
Cut the Cut the
binding bandbinding band
Cut the
binding band
Liquid injection line
PMV coil
2-way valve coil
Cut the binding band
Liquid injection line PMV coil connector
Cut the binding band
2-way valve coil connector
1. Detachment
1) Following to work Detachment ④
2) Cut the binding band (4 positions) on the back
surface.
3) Pull the connector for 2-way valve coil out of CDB
P.C.board.
4) Remove the 2-way valve coil.(M4 screw)
2. Attachment
Attachment the 2-way valve coil in the reverse process
of "1.Detachment"
Liquid
injection
line PMV
coil
2-way
valve coil
Work procedure
Exchange
parts name