EasyManuals Logo

Trace Engineering PP-SW2512/D User Manual

Trace Engineering PP-SW2512/D
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #20 background imageLoading...
Page #20 background image
©1999 Trace Engineering
14
Figure 16
AC Output Wiring
AC WiringSW Series Dual Inverter Models (continued)
AC Output Wiring To AC Bypass Box
Select a convenient knockout on the AC Disconnect/Bypass Box for installing conduit which will carry the
wires from the inverters output to the sub-panel.
Use #6 AWG THHN wire (minimum) and route it through the conduit between the AC Disconnect/Bypass
Box and the sub-panel.
Connect the Ground wire to the Ground block in the AC Disconnect/Bypass Box. Connect the other end
to the sub-panels Ground Bar.
Connect the L1 (Hot-black) wire to the INVERTER 1 HOT OUT L1 as indicated in Figures 13 and 16.
*Connect the L2 (Hot-red) wire to the INVERTER 2 HOT OUT L2) as indicated in Figures 13 and 16.
Connect the Neutral wire to the Neutral block in the AC Disconnect/Bypass Box. Connect the other end to
the sub-panels Neutral Bar.
Torque service crimps to 45 in-lb (3.75 ft-lb), (5 N-m).
NOTE: The Ground and Neutral are bonded only at the main utility service panel.
NOTE: Items marked with an astrict (*) are applicable to dual inverter models only.
2.0 INSTALLATION
NOTE:
DO NOT REMOVE FACTORY
WIRING!
*
WHITE
#6AWG
BLACK
#6AWG
RED
#6AWG
0N
OFF
D
60
60
D
OFF
0N
OFF
D
60
60
OFF
D
INV 2
INV 1
GROUND
INPUT AND OUT PUT
SOURCE AND LOAD
NEUTRAL
Ground to
Sub-panel
(Loads)
L1 to Sub-panel
(Loads)
HOT
L2 to Sub-panel
(Loads)
HOT
Neutral to
Sub-panel
(Loads)
2903-00-011A

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Trace Engineering PP-SW2512/D and is the answer not in the manual?

Trace Engineering PP-SW2512/D Specifications

General IconGeneral
BrandTrace Engineering
ModelPP-SW2512/D
CategoryInverter
LanguageEnglish

Related product manuals