EasyManua.ls Logo

Trane Technologies 23 Series - Installation Essentials; Items Shipped and Tools Required

Default Icon
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7
23 Series High Wall Unit
Items Shipped with the 23 Series High Wall Unit
After unpacking the unit(s), please refrain from disposing of the packaging materials until items
listed below are located. If any of these are missing, please contact the point of sale to obtain
these items.
Indoor Unit
1. Refrigeration pipe insulation (short piece)
2. Mounting bracket
3. Installation instructions (may be included in outdoor unit)
4. Flare nuts for connecting refrigerant pipes*
5. Mounting fasteners*
*typically packaged in cellophane bubble
Necessary tools
1. Drill
2. Hole Saw
3. Phillips™ screwdriver
5. Vacuum pump capable of pulling to 350 microns
6. Manifold gauge set designed for this type of equipment
7. Manifold gauge hoses with 5/16" connections or 1/4" to 5/16" adapters.
8. Tubing benders
9. R-410A Flaring tool
10. Adjustable wrench
11. Nitrogen regulator
12. Nitrogen flow meter
13. Tube cutter
14. Torque wrench set

Related product manuals