10 18-BC83D1-2
STEP 5 - Replace the pressure tap valve cores
after the service valves have cooled.
STEP 2 - Check for leaks by using a soapy solu-
tion or bubbles at each brazed location.
Remove nitrogren pressure and repair any leaks
before continuing.
Section 8. Refrigerant Line Leak Check
8.1 Check For Leaks
STEP 1 - Pressurize the refrigerant lines and
evaporator coil to 150 PSIG using dry nitrogen.
150 PSIG

Other manuals for Trane 2TWB-SVU01A-EN

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Trane 2TWB-SVU01A-EN and is the answer not in the manual?

Trane 2TWB-SVU01A-EN Specifications

General IconGeneral
BrandTrane
Model2TWB-SVU01A-EN
CategoryHeat Pump
LanguageEnglish

Related product manuals