EasyManua.ls Logo

Trane CGAD020 - Clearances for Maintenance and Air Circulation

Trane CGAD020
85 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CGAD-SVN02C-EN 9
Clearances for Maintenance
and Air Circulation
For the equipment's good operation, it
is very important to leave enough room
between the units and between the
Fig. 04 - Maintenance and Air Circulation Clearances
NOTE:
Unit: mm
units and the walls in order to allow a
good air circulation without the danger
of hot air returning to the equipment
(air short-circuit). Also read the section
called "Application Considerations" in
this manual.