SSAAFFEETTYY WWAARRNNIINNGG
Only qualified personnel should install and service the equipment. The installation, starting up, and servicing of heating, ventilating, and air-conditioning
equipment can be hazardous and requires specific knowledge and training. Improperly installed, adjusted or altered equipment by an unqualified person
could result in death or serious injury. When working on the equipment, observe all precautions in the literature and on the tags, stickers, and labels that
are attached to the equipment.
November 2020
RRTT--SSVVXX5511HH--EENN
Installation, Operation, and Maintenance
Packaged Rooftop Air
Conditioners Foundation
Cooling and Gas/Electric
15 to 25 Tons, 60 Hz
Model Numbers: GBC180-300

Table of Contents

Questions and Answers:

Trane Foundation GBC240 Specifications

General IconGeneral
BrandTrane
ModelFoundation GBC240
CategoryAir Conditioner
LanguageEnglish

Summary

Introduction

Proper Field Wiring and Grounding

Details essential requirements and hazards for field wiring and grounding.

Personal Protective Equipment (PPE)

Outlines mandatory PPE for technicians to prevent injury from hazards.

Model Number Description

Dimensional Data

Weights

Rigging

Instructions and warnings for safely lifting and rigging the unit using appropriate equipment.

Installation

Unit Foundation

Critical steps for ensuring proper structural support and preventing collapse during installation.

Main Electrical Power Requirements

Verifying power supply compatibility and ensuring proper wiring connections for the unit.

Field Installed Power Wiring

Guidelines for properly sizing and installing the unit's supply power wiring.

Standard Wiring

Requirements for electrical service protection, disconnect switches, and proper grounding.

Voltage Imbalance

Explains the importance of maintaining voltage balance for motor longevity and operational integrity.

Electrical Phasing (Three Phase Motors)

Procedures for determining and correcting electrical phasing for proper three-phase motor rotation.

Compressor Crankcase Heaters

Explains the function of crankcase heaters for preventing oil foaming and ensuring compressor longevity.

Pre Start

Start Up

Electromechanical Controls - Sequence Of Operation

Describes the sequence of operation for electromechanical controls during cooling and heating modes.

JADE Controls - Low Leak Economizer Sequence of Operation

Provides sequence of operation tables for JADE controls with DCV and enthalpy settings.

Compressor Start-Up

Procedures for starting compressors, verifying rotation, and checking pressures.

Heating Start-Up

Recommended procedure for starting the heater with the main gas supply off for initial checks.

Final System Set Up

Final checks before leaving the unit, including programming, inspections, and securing panels.

Maintenance

Fan Belt Adjustment-Belt Drive Units

Detailed instructions for adjusting and maintaining belt tension for optimal fan operation.

Troubleshooting

Standard Troubleshooting

Steps for diagnosing unit issues using the Ignition Module (IGN) and system status information.

Failures

Identifies common heating and cooling failures based on Ignition Module LED indicators.

Low Leak Economizer – (LLE) Troubleshooting

Guidance on interpreting alarm messages from the economizer controller for diagnosis.

Low Leak Economizer Fault Codes

Lists fault codes for LLE systems and their corresponding issues.

Wiring Diagrams

Warranty

Basic Warranty

Details the warranty period and coverage for defects in material and manufacture.

Exclusions and Limitations

Specifies what is not covered by the warranty and limitations on liability.