EasyManua.ls Logo

Trane GAM5A0A18M11SAA - Brazing, Pressurizing, and Leak Checking

Trane GAM5A0A18M11SAA
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
24
LIFT
STEP 7 - Braze refrigerant line connections.
Note: The suction line must be insulated prior to
brazing the line set to the air handler stubs.
1. Pull back the insulation before brazing the suc-
tion line.
2. Wrap the Vapor Sensor with wet rag.
3. Braze the refrigerant line connections.
Important: Care must be taken during solder cap
removal and brazing to avoid damage to unit compo-
nents.
LIFT
STEP 8 - Pressurize the refrigerant lines and evapo-
rator coil to 150 PSIG using dry nitrogen.
150 PSI
STEP 9 - Check for leaks by using a soapy solution
or bubbles at each brazed location.
LIFT
Wet Rag on
Vapor Sensor

Related product manuals