WSHP-SVX01AA-EN
91
Pre-Start Checklist
Before energizing the unit, the following system
devices must be checked:
• Is the high voltage power supply correct and in
accordance with the nameplate ratings?
• Is phasing of the unit correct per compressor
rotation (scroll compressor only)?
• Is the field wiring and circuit protection the correct
size?
• Is the low voltage control circuit wiring correct per
the unit wiring diagram?
• Is the piping system clean/complete and correct? (A
recommendation of all system flushing of debris
from the water-to-refrigerant heat exchanger, along
with air purging from the water-to-refrigerant heat
exchanger be done in accordance with the Closed-
Loop/Ground Source Heat Pump Systems
Installation Guide).
• Is vibration isolation provided? (i.e. unit isolation
pad, hose kits)
• Is unit serviceable? (See clearance specifications in
Unit Dimensions and Weights).
• Are the low/high-side pressure temperature caps
secure and in place?
• Are all the unit access panels secure and in place?
• Is the thermostat in the OFF position?
• Is the water flow established and circulating
through all the units?
• Is the duct work correctly sized, run, taped,
insulated and weather proofed with proper unit
arrangement?
• Is the condensate line properly sized, run, trapped,
pitched and primed?
• Is the zone sensor correctly wired and in a good
location?
• Does the indoor blower turn freely without
rubbing?
• Has all work been done in accordance with
applicable local and national codes?
• Has heat transfer fluid been added in the proper
mix to prevent freezing in closed system
application?