EasyManua.ls Logo

Trane GEVE User Manual

Trane GEVE
124 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
SSAAFFEETTYY WWAARRNNIINNGG
Only qualified personnel should install and service the equipment. The installation, starting up, and servicing of heating, ventilating, and air-conditioning
equipment can be hazardous and requires specific knowledge and training. Improperly installed, adjusted or altered equipment by an unqualified person
could result in death or serious injury. When working on the equipment, observe all precautions in the literature and on the tags, stickers, and labels that
are attached to the equipment.
August 2021
WWSSHHPP--SSVVXX0011YY--EENN
Installation, Operation, and Maintenance
Water Source Heat Pump
Axiom Horizontal/Vertical
GEH/V*
0.5 to 25 Tons, 50/60 Hz
Model Numbers:
GEHE 006-060 - 50/60 Hz
GEVG 006-060 - 60 Hz
GEHE 072-180 - 50/60 Hz
GEVE 072-300 - 50/60 Hz

Table of Contents

Other manuals for Trane GEVE

Questions and Answers:

Trane GEVE Specifications

General IconGeneral
BrandTrane
ModelGEVE
CategoryHeat Pump
LanguageEnglish

Summary

Water Source Heat Pump Installation

Axiom™ Horizontal/Vertical GEH/V* Series

Overview of the GEH/V* Axiom™ horizontal/vertical heat pump series.

Capacity and Frequency Range

Covers the 0.5 to 25 Tons, 50/60 Hz specifications for the units.

Model Number Identification

Lists the model numbers for the GEH/V* series units.

Critical Safety Warnings

Essential safety precautions for installation and operation.

Introduction and Safety Precautions

Understanding Manual Advisories

Explains the meaning of WARNING, CAUTION, and NOTICE advisories.

Environmental and Refrigerant Practices

Discusses environmental concerns and responsible refrigerant handling.

Field Wiring and Grounding Requirements

Critical safety instructions for proper electrical field wiring and grounding.

Personal Protective Equipment (PPE)

Mandates the use of appropriate PPE for safety during installation and servicing.

Installation Policies and Document Information

Adherence to EHS Policies

Emphasizes following company's Environmental, Health, and Safety policies.

Document Copyright and Revisions

Details copyright, trademarks, and revision history of the manual.

Model Number Description

Unit Configuration and Development Sequence

Explains digits 1-4 of the model number for unit configuration and development.

Nominal Capacity and Voltage Specifications

Describes digits 5-8 of the model number for capacity and voltage.

Heat Exchanger and Design Sequence

Explains digits 9-10 of the model number for heat exchanger and design sequence.

Refrigeration Circuit and Blower Configuration

Details digits 11-12 of the model number for refrigeration and blower.

GEV Model Number Breakdown

GEV Unit Configuration and Development

Explains digits 1-4 of the GEV model number for configuration and development.

GEV Nominal Size and Voltage

Describes digits 5-8 of the GEV model number for nominal size and voltage.

GEV Heat Exchanger and Refrigeration Circuit

Details digits 9-11 of the GEV model number for heat exchanger and refrigeration.

GEV Blower and Freeze Protection

Explains digits 12-13 of the GEV model number for blower and freeze protection.

Manual Overview and Identification

Manual Purpose and Content

Describes the scope and purpose of the manual for installation and maintenance.

Unit and Compressor Nameplates

Explains the location and importance of unit and compressor nameplates.

Model Number Significance

Details how the model number identifies unit type, components, and options.

General Unit Information

Unit Preparation and Description

Unit preparation before shipment and general description of components.

Coil Specifications

Details the construction of air-to-refrigerant and water-to-refrigerant coils.

Control System Options

Lists available control options: Deluxe 24V, Tracer® ZN524, and UC400(B).

System Input Devices

Explains the need for thermostats or building automation systems for operation.

Optional Unit Features

Boilerless Control/Electric Heat

Describes the option for units without boilers, using electric heat.

Supplemental or Boilerless Electric Heat

Details supplemental heat options for specific models.

Hot Gas Reheat (Option)

Explains the function of the hot gas reheat option for humidity control.

2-Speed Blower Motor (Option)

Describes the 2-speed blower motor option for GEH/V 6-25 ton units.

Pre-Installation Procedures

Fiberglass Wool Safety Warning

Critical safety warning regarding fiberglass wool fibers and required PPE.

Unit and Jobsite Inspection

Checklists for inspecting units upon receipt and before jobsite acceptance.

Jobsite Storage Recommendations

Guidelines for proper unit storage to prevent damage and microbial growth.

Unit Dimensions and Clearances

Service Clearance Requirements

Specifies NEC and local code requirements for unit service clearances.

GEH 0.5 to 5 Tons Clearances

Illustrates required clearances for GEH 0.5-5 ton models.

GEH 6 to 15 Tons Clearances

Illustrates required clearances for GEH 6-15 ton models.

Unit Dimensions and Clearances

GEV 0.5 to 5 Tons Clearances

Illustrates required clearances for GEV 0.5-5 ton models.

GEV 6 to 10 Tons Clearances

Illustrates required clearances for GEV 6-10 ton models.

GEV 12.5 to 25 Tons Clearances

Illustrates required clearances for GEV 12.5-25 ton models.

Unit Dimensions: GEHE Models

Left Return/Left Supply Dimensions

Diagram and table for GEHE left return/left supply configuration dimensions.

Left Return/Back Supply Dimensions

Diagram and table for GEHE left return/back supply configuration dimensions.

Unit Dimensions: GEHE Models

Left Return/Back Supply Data Table

Table with dimensional data for GEHE left return/back supply.

Left Return/Right Supply Diagrams

Diagram for GEHE left return/right supply configuration.

Left Return/Right Supply Data Table

Table with dimensional data for GEHE left return/right supply.

Unit Dimensions: GEHE Models

Right Return/Left Supply Diagrams

Diagram for GEHE right return/left supply configuration.

Right Return/Left Supply Data Table

Table with dimensional data for GEHE right return/left supply.

Right Return/Back Supply Diagrams

Diagram for GEHE right return/back supply configuration.

Unit Dimensions: GEHE Models

Right Return/Back Supply Data Table

Table with dimensional data for GEHE right return/back supply.

Right Return/Right Supply Diagrams

Diagram for GEHE right return/right supply configuration.

Right Return/Right Supply Data Table

Table with dimensional data for GEHE right return/right supply.

Unit Dimensions: GEVG Models

Left Return/Top Supply Diagrams

Diagram for GEVG left return/top supply configuration.

Left Return/Top Supply Data Table

Table with dimensional data for GEVG left return/top supply.

Right Return/Top Supply Diagrams

Diagram for GEVG right return/top supply configuration.

Unit Dimensions: GEVG & GEHE Models

Right Return/Top Supply Data Table

Table with dimensional data for GEVG right return/top supply.

GEHE 6-10 Ton Clearances

Diagrams illustrating clearances for GEHE 6-10 ton models.

GEHE 6-10 Ton Dimensional Data

Table with dimensional data for GEHE 6-10 ton models.

Unit Dimensions: GEHE Models

Right Return/Back Supply Diagrams

Diagrams illustrating clearances for GEHE right return/back supply.

Right Return/Back Supply Data Table

Table with dimensional data for GEHE right return/back supply.

Left Return/Right Supply Diagrams

Diagrams illustrating clearances for GEHE left return/right supply.

Unit Dimensions: GEHE Models

Left Return/Right Supply Data Table

Table with dimensional data for GEHE left return/right supply.

Left Return/Back Supply Diagrams

Diagrams illustrating clearances for GEHE left return/back supply.

Unit Dimensions: GEHE Models

Left Return/Back Supply Data Table

Table with dimensional data for GEHE left return/back supply.

GEHE 12.5-15 Ton Diagrams

Diagrams illustrating dimensions for GEHE 12.5-15 ton models.

Unit Dimensions: GEHE Models

GEHE 12.5-15 Ton Diagrams

Diagrams illustrating dimensions for GEHE 12.5-15 ton models.

Unit Dimensions: GEVE Models

Front Return/Back Supply Diagrams

Diagrams illustrating dimensions for GEVE 6-10 ton units.

Front Return/Back Supply Data Table

Table with dimensional data for GEVE front return/back supply.

Front Return/Top Supply Diagrams

Diagrams illustrating dimensions for GEVE 6-10 ton units.

Unit Dimensions: GEVE Models

Front Return/Top Supply Data Table

Table with dimensional data for GEVE front return/top supply.

Back Return/Front Supply Diagrams

Diagrams illustrating dimensions for GEVE 6-10 ton units.

Unit Dimensions: GEVE Models

Back Return/Front Supply Data Table

Table with dimensional data for GEVE back return/front supply.

Back Return/Top Supply Diagrams

Diagrams illustrating dimensions for GEVE 6-10 ton units.

Unit Dimensions: GEVE Models

Front Return/Back Supply Diagrams

Diagrams illustrating dimensions for GEVE 12.5-15 ton units.

Back Return/Front Supply Diagrams

Diagrams illustrating dimensions for GEVE 12.5-15 ton units.

Unit Dimensions: GEVE Models

Front Return/Back Supply Diagrams

Diagrams illustrating dimensions for GEVE 12.5-15 ton units.

Back Return/Front Supply Diagrams

Diagrams illustrating dimensions for GEVE 12.5-15 ton units.

Unit Dimensions: GEVE Models

Front Return/Top Supply Diagrams

Diagrams illustrating dimensions for GEVE 12.5-15 ton units.

Back Return/Top Supply Diagrams

Diagrams illustrating dimensions for GEVE 12.5-15 ton units.

Unit Dimensions: GEVE Models

Front Return/Back Supply Diagrams

Diagrams illustrating dimensions for GEVE 20-25 ton units.

Front Return/Back Supply Data Table

Table with dimensional data for GEVE front return/back supply.

Back Return/Front Supply Diagrams

Diagrams illustrating dimensions for GEVE 20-25 ton units.

Unit Dimensions: GEVE Models

Back Return/Front Supply Data Table

Table with dimensional data for GEVE back return/front supply.

Front Return/Top Supply Diagrams

Diagrams illustrating dimensions for GEVE 20-25 ton units.

Unit Dimensions: GEVE Models

Front Return/Top Supply Data Table

Table with dimensional data for GEVE front return/top supply.

Front Return/Back Supply Diagrams

Diagrams illustrating dimensions for GEVE 20-25 ton units.

Unit Dimensions: GEVE Models

Back Return/Top Supply Diagrams

Diagrams illustrating dimensions for GEVE 20-25 ton units.

Unit Dimensions: GEHE Waterside Economizer

GEHE Waterside Economizer Diagram

Diagram showing dimensions for GEHE waterside economizer.

GEHE Waterside Economizer Data Table

Table with dimensional data for GEHE waterside economizer.

Unit Dimensions: GEVG Waterside Economizer

GEVG Waterside Economizer Diagrams

Diagrams showing dimensions for GEVG waterside economizer.

GEVG Waterside Economizer Data Table

Table with dimensional data for GEVG waterside economizer.

Unit Dimensions: GEVG & GEHE Economizer

GEVG Waterside Economizer Data

Table with dimensional data for GEVG waterside economizer.

GEHE Hanging Unit Diagram

Diagram for hanging GEHE unit with waterside economizer.

Unit Dimensions: GEHE Economizer

GEH Hanging Unit Data Table

Table with dimensional data for GEH hanging unit with economizer.

GEHE Right Return Economizer Diagrams

Diagrams for GEHE right return with economizer.

GEHE Left Return Economizer Diagrams

Diagrams for GEHE left return with economizer.

Unit Dimensions: GEHE Economizer

GEHE Economizer Data Table

Table with dimensional data for GEHE economizer.

GEHE Right Return Economizer Diagrams

Diagrams for GEHE right return with economizer.

Unit Dimensions: GEVE Economizer

GEHE Economizer Data Table

Table with dimensional data for GEHE economizer.

GEVE Economizer Diagrams

Diagrams for GEVE economizer.

Unit Dimensions: GEVE Economizer

GEVE Economizer Data Table

Table with dimensional data for GEVE economizer.

GEVE Economizer Coil Piping Diagram

Diagram illustrating the coil piping for the economizer.

Unit Weights and Hanging Information

GEH Unit Weights

Lists approximate unit weights for GEH models (0.5-5 tons).

GEV Unit Weights

Lists approximate unit weights for GEV models (0.5-5 tons).

GEH Model Hanging Weight Distribution

Details weight distribution for proper hanging of GEH models.

Improper Unit Lift Warning

Critical safety warning about improper lifting procedures.

Installation Procedures

Field Wiring and Grounding Safety

Safety instructions for field wiring and grounding.

General Installation Checklist

Key steps for successful unit installation.

Main Electrical Connection Requirements

Critical safety warnings and instructions for main electrical connections.

Electric Heat and Low Voltage Wiring

Requirements for electric heat and low voltage control wiring.

Installation: Ductwork

Supply-Air Ductwork Installation

Guidelines for installing supply-air ductwork, including flanges and connectors.

Return-Air Ductwork Installation

Instructions for installing return-air ductwork and filter racks.

Ducted Panel Conversion

Information on converting to a ducted return-air system.

Installation: Ductwork and Filter Racks

Return-Air Duct Panel Specifications

Details for GEH return-air duct panels and GEVG ducted panels.

Ducted Filter Rack Availability

Information on ducted filter racks for GEH 0.5-5 ton units.

Filter Opening Size Tables

Tables showing ducted filter opening sizes for GEH/V units.

Installation: Filtration and Hanging

Dual Filtration Option

Explanation of the dual filtration option for GEH 0.5-5 ton models.

Sound Attenuation Pad Recommendation

Suggests using a pad for noise reduction in sensitive installations.

Horizontal Unit Hanging Procedure

Critical warning and steps for safely hanging horizontal units.

Installation: Plumbing and Cleaning

Condensate Drain Connection Requirements

Details for proper condensate drain trapping, especially for negative pressure systems.

Water Supply and Return Pipe Connections

Guidance on connecting water piping, recommending flexible hoses.

Water Loop Cleaning and Flushing

Steps for cleaning and flushing the water loop system.

Installation: Electrical Wiring

Field Installed Power Wiring Safety

Safety warning and instructions for field power wiring.

Copper Conductor Requirement

Emphasizes using only copper conductors for unit wiring.

Main Unit Power Wiring and Grounding

Safety warnings and instructions for main unit power connections.

Control Power Transformer and Hazardous Voltage

Information on the control power transformer and its associated voltage hazard.

Installation: Controls and Thermostats

Thermostat Location Considerations

Guidance on selecting optimal locations for thermostats and zone sensors.

Deluxe Controller Thermostat Options

Lists available thermostats compatible with the Deluxe controller.

Installation: Control System Components

Deluxe Controller Thermostat Options (Continued)

Continues listing thermostat options for Deluxe controllers.

Zone Sensor Selection for Tracer/UC400

Lists zone sensors compatible with Tracer® ZN524 and UC400 controllers.

Installation: Zone Sensor Options

Zone Sensor Selection for Tracer/UC400 (Continued)

Continues listing zone sensors for Tracer® ZN524 and UC400 controllers.

Installation: Control Wiring

Wireless Zone Sensor Selection

Lists wireless zone sensors compatible with Tracer® UC400 controller.

24 Vac Control Wiring Requirements

Instructions and warnings for 24 Vac control wiring, including resistance limits.

Deluxe Control Wiring Diagrams

Diagrams for low-voltage connections for deluxe 24V control packages.

Installation: Deluxe Control Wiring

GEH/V 6-25 Ton Deluxe Control Wiring

Wiring diagrams for deluxe controls on GEH/V 6-25 ton units.

Deluxe Control Wiring Examples

Illustrates various deluxe control wiring scenarios.

Installation: Control Functions and Wiring

Alarm and Compressor Disable Wiring

Diagram for deluxe controls general alarm and compressor disable.

External Smoke Detection Wiring

Instructions for wiring external smoke detection systems.

Hazardous Voltage and Wiring Safety

Critical safety warnings for hazardous voltage and wiring.

Installation: Blower Motor Speed Adjustment

Wiring and Grounding Safety Reinforcement

Reinforces safety for field wiring and grounding.

Relay Location Identification

Shows the location of the relay for GEH units.

Speed-Tap Wire Adjustment

Steps for removing and connecting speed-tap wires for blower motor adjustment.

Installation: Motor and Economizer

Vertical Unit ECM Motor Programming

Details ECM motor programming for vertical units with deluxe controls.

ECM Control Box and Board

Shows the ECM control box and board.

Waterside Economizer Installation Safety

Critical safety warning for waterside economizer installation.

Installation: Economizer for Horizontal Units

Field Wiring and Grounding Safety

Reinforces safety for field wiring and grounding.

Horizontal Unit Economizer Installation Steps

Step-by-step guide for installing economizers on horizontal units.

Installation Step Diagrams

Illustrates steps 3 and 4 of the economizer installation.

Installation: Economizer Steps

Economizer Installation Step Diagrams

Illustrates steps 6, 7, 8, and 9 of the economizer installation.

Installation: Economizer Wiring and Panels

Economizer Installation Step Diagrams

Illustrates steps 10, 11, 12, and 13 of the economizer installation.

Installation: Economizer and Drain Piping

Installation Step Diagrams

Illustrates steps 15 and 19 of the economizer installation.

Vertical Unit Waterside Economizer Installation

Steps for installing a waterside economizer on vertical units.

Vertical Unit Economizer Step 1

Illustrates step 1 of vertical economizer installation.

Installation: Vertical Economizer Steps

Vertical Unit Economizer Step Diagrams

Illustrates steps 2, 3, 4, and 8 of vertical economizer installation.

Installation: Economizer for GEH/GEV 6-25 Ton

Hazardous Voltage and Wiring Safety

Critical safety warnings for hazardous voltage and field wiring.

Economizer Installation Steps for GEH/GEV

Steps for installing economizers on GEH/GEV 6-25 ton models.

Waterside Economizer Start-Up Sequence

Cooling Mode Start-Up Procedure

Step-by-step guide for initiating unit start-up in cooling mode.

Heating Mode Start-Up Procedure

Step-by-step guide for initiating unit start-up in heating mode.

Three-Way Valve Specifications

Details specifications for waterside economizing three-way valves.

Waterside Economizer Start-Up Sequence

Three-Way Valve Specifications (Continued)

Continues valve specifications for waterside economizing three-way valves.

Electrical Data: GEHE Static Motors

Table 48: GEHE Static Motor Electrical Data

Electrical data for standard static motors in GEHE units.

Electrical Data: GEHE Static Motors

Table 48: GEHE Static Motor Electrical Data (Continued)

Continues electrical data for GEHE unit motors.

Electrical Data: GEHE Static Motors

Table 48: GEHE Static Motor Electrical Data (Continued)

Continues electrical data for GEHE unit motors.

Electrical Data: GEHE Static Motors

Table 48: GEHE Static Motor Electrical Data (Continued)

Continues electrical data for GEHE unit motors.

Electrical Data: GEHE Static Motors

Table 48: GEHE Static Motor Electrical Data (Continued)

Continues electrical data for GEHE unit motors.

Electrical Data: GEHE Static Motors

Table 48: GEHE Static Motor Electrical Data (Continued)

Continues electrical data for GEHE unit motors.

Electrical Data: GEHE Static Motors

Table 48: GEHE Static Motor Electrical Data (Continued)

Continues electrical data for GEHE unit motors.

Electrical Data: GEHE Static Motors

Table 48: GEHE Static Motor Electrical Data (Continued)

Continues electrical data for GEHE unit motors.

Electrical Data: GEHE Static Motors

Table 48: GEHE Static Motor Electrical Data (Continued)

Continues electrical data for GEHE unit motors.

Electrical Data: GEHE Static Motors

Table 48: GEHE Static Motor Electrical Data (Continued)

Continues electrical data for GEHE unit motors.

Electrical Data: GEHE Static Motors

Table 48: GEHE Static Motor Electrical Data (Continued)

Continues electrical data for GEHE unit motors.

Electrical Data: GEHE High Static Motors

Table 49: GEHE High Static Motor Electrical Data

Electrical data for GEHE high static motors (0.5-5 tons).

Electrical Data: GEHE High Static Motors

Table 49: GEHE High Static Motor Electrical Data (Continued)

Continues electrical data for GEHE high static motors.

Electrical Data: GEHE High Static Motors

Table 49: GEHE High Static Motor Electrical Data (Continued)

Continues electrical data for GEHE high static motors.

Electrical Data: GEHE High Static Motors

Table 49: GEHE High Static Motor Electrical Data (Continued)

Continues electrical data for GEHE high static motors.

Electrical Data: GEV ECM Motors

Table 50: GEV ECM Motor Electrical Data

Electrical data for ECM motors in GEV units (0.5-5 tons).

Electrical Data: GEV ECM Motors

Table 50: GEV ECM Motor Electrical Data (Continued)

Continues electrical data for GEV ECM motors.

Electrical Data: GEHE Two-Speed Motors

Table 51: GEHE Two-Speed Blower Motor Electrical Data

Electrical data for GEHE two-speed blower motors (6-25 tons).

Electrical Data: GEHE Two-Speed Motors

Table 51: GEHE Two-Speed Blower Motor Electrical Data (Continued)

Continues electrical data for GEHE two-speed blower motors.

Electrical Data: GEHE Two-Speed Motors

Table 51: GEHE Two-Speed Blower Motor Electrical Data (Continued)

Continues electrical data for GEHE two-speed blower motors.

Electrical Data: GEHE Two-Speed Motors

Table 51: GEHE Two-Speed Blower Motor Electrical Data (Continued)

Continues electrical data for GEHE two-speed blower motors.

Electrical Data: GEHE Two-Speed Motors

Table 51: GEHE Two-Speed Blower Motor Electrical Data (Continued)

Continues electrical data for GEHE two-speed blower motors.

Minimum and Maximum Voltage Data

Electrical minimum and maximum voltage data for units.

Electrical Data: Voltage Range

Minimum and Maximum Voltage Data (Continued)

Continues electrical minimum and maximum voltage data.

Pre-Start Checklist

System Device Verification

Checklist for verifying system devices before unit energization.

Ductwork and Condensate Line Checks

Verifies ductwork and condensate line setup and condition.

Zone Sensor and Blower Checks

Verifies zone sensor wiring and blower operation.

Code Compliance and Heat Transfer Fluid

Confirms code adherence and proper heat transfer fluid mix.

Start Up Procedures

Initial Unit Start-Up Sequence

Step-by-step guide for initial unit start-up and operational checks.

Start-Up Checklist and Log

Contractor checklist and log for system and unit verification.

Operating Pressures Overview

Information on factors affecting operating refrigerant pressures and temperatures.

Operating Pressures: GE Units

Cooling/Heating Operating Pressures Table

Table detailing operating pressures for GE units in cooling and heating modes.

Operating Pressures: GE Units

Cooling/Heating Operating Pressures Table (Continued)

Continues tables of operating pressures for GE units.

Operating Pressures: GE Units

Cooling/Heating Operating Pressures Table (Continued)

Continues tables of operating pressures for GE units.

Operating Pressures: GE Units

Cooling/Heating Operating Pressures Table (Continued)

Continues tables of operating pressures for GE units.

Operating Pressures: GE Units

Cooling/Heating Operating Pressures Table (Continued)

Continues tables of operating pressures for GE units.

Operating Pressures: GE Units

Cooling/Heating Operating Pressures Table (Continued)

Continues tables of operating pressures for GE units.

Operating Pressures: GE Units

Cooling/Heating Operating Pressures Table (Continued)

Continues tables of operating pressures for GE units.

Operating Pressures: GE Units

Cooling/Heating Operating Pressures Table (Continued)

Continues tables of operating pressures for GE units.

Operating Pressures: GE Units

Cooling/Heating Operating Pressures Table (Continued)

Continues tables of operating pressures for GE units.

Operating Pressures: GE Units

Cooling/Heating Operating Pressures Table (Continued)

Continues tables of operating pressures for GE units.

Operating Pressures: GE Units

Cooling/Heating Operating Pressures Table (Continued)

Continues tables of operating pressures for GE units.

Operating Pressures: GE Units

Cooling/Heating Operating Pressures Table (Continued)

Continues tables of operating pressures for GE units.

Operating Pressures: GE Units

Cooling/Heating Operating Pressures Table (Continued)

Continues tables of operating pressures for GE units.

Operating Pressures: GE Units

Cooling/Heating Operating Pressures Table (Continued)

Continues tables of operating pressures for GE units.

Operating Pressures: GE Units

Cooling/Heating Operating Pressures Table (Continued)

Continues tables of operating pressures for GE units.

Operating Pressures: GE Units

Cooling/Heating Operating Pressures Table (Continued)

Continues tables of operating pressures for GE units.

Water Pressure Drop

Provides data to define feet of head/pressure drop for units.

Cooling Water Pressure Drop Table (0.5-6 Ton)

Table of cooling water pressure drop for GE units (0.5-6 ton).

Heating Water Pressure Drop Table

Table of heating water pressure drop for GE units.

Water Pressure Drop and Volume

Heating Water Pressure Drop Table (Continued)

Continues heating water pressure drop data for GE units.

Water Volume for Glycol Calculation

Provides data for calculating unit glycol requirements.

Water Volume Table for GE* Units

Table listing water volume data for GE* units.

Maintenance Procedures

Hazardous Service Procedures Warning

Critical safety warning for hazardous service procedures.

Preventative Maintenance Suggestions

Routine maintenance recommendations for optimal operation.

Filter Maintenance and Sizing

Importance of filter maintenance and inspection schedule.

GE* Model Filter Sizing Tables

Tables detailing filter sizes for GE* models.

Maintenance: Cleaning and Condensate

Hazardous Chemical Handling Warning

Safety warning for handling hazardous chemicals used in coil cleaning.

Condensate Trap Priming

Ensures condensate trap priming to prevent system issues.

Troubleshooting Guide

Hazardous Service Procedures Warning

Crucial safety warning for hazardous service procedures.

Deluxe Controls Diagnostic LEDs

Using diagnostic LEDs for troubleshooting deluxe control options.

Diagnostic LED Troubleshooting Table

Table correlating LED states to controller modes for troubleshooting.

Troubleshooting Common Issues

Troubleshooting Table: No Response, Short Cycling, Blower Issues

Lists problems, causes, and corrections for thermostat response, short cycling, and blower issues.

Troubleshooting Table: Insufficient Capacity

Addresses insufficient capacity issues related to filters, RPM, leaks, and refrigerant.

Troubleshooting Table: High Pressure Switch Open

Lists causes and corrections for high-pressure switch openings.

Troubleshooting Common Issues

Troubleshooting Table: High Head Pressure

Addresses high head pressure issues related to heat exchanger, refrigerant, and water temperature.

Troubleshooting Table: Low Suction Pressure

Addresses low suction pressure issues related to refrigerant charge and expansion valves.

Troubleshooting Table: Low Pressure Switch Open

Lists causes and corrections for low-pressure switch openings.

Wiring Diagrams Information

Isolation Valve Wiring Connections

Details wiring connections for isolation valves.

Wiring Diagram Matrix for GEVG/EXVG/DXVG

Matrix linking wiring diagram numbers to unit descriptions and models.

Wiring Diagrams: GEH_V Deluxe

GEH_V 380-420V 50Hz 3-Ph Wiring Diagram

Wiring diagram for GEH_V units with deluxe controls, specific voltage/phase.

Wiring Diagrams: GEH_V Deluxe

GEH_V 460V 60Hz 3-Ph Wiring Diagram

Wiring diagram for GEH_V units with deluxe controls, specific voltage/phase.

Wiring Diagrams: GEH_V Tracer ZN524

GEH_V Tracer® ZN524 460V 60Hz 3-Ph Wiring Diagram

Wiring diagram for GEH_V units with Tracer® ZN524 controls.

Wiring Diagrams: GEHE UC400

GEHE 0.5-1.5 Tons UC400 Wiring Diagram

Wiring diagram for GEHE units (0.5-1.5 tons) with UC400 controls.

Wiring Diagrams: GEHE UC400

GEHE 2-5 Tons UC400 Wiring Diagram

Wiring diagram for GEHE units (2-5 tons) with UC400 controls.

Wiring Diagrams: GEH_V UC400

GEH_V 6-25 Tons UC400 Wiring Diagram

Wiring diagram for GEH_V units (6-25 tons) with UC400 controls.

Warranty Information

Standard Warranty Terms

Details the standard 12-month parts-only warranty and 5-year compressor warranty.

Extended Warranty Options

Information on optional extended warranties covering years 2 through 5.

Related product manuals